Engineering and design, before construction starts.

We start with the drawings: SLDs, panel general-arrangements, distribution layouts, earthing and ELV plans. From there we coordinate with the project's mechanical, plumbing, fire and networking agencies, from concept to commissioning.

What we draw

Eight drawing categories, produced, revised and archived.

Every category below is on the in-house drawing register. Each project's drawings carry revision numbers, approval signatures, and a clear path from design intent through GFC (Good-for-Construction) to as-built.

DWG / 01

Single Line Diagrams

LV and HT SLDs from incomer to last DB, with fault levels, protection coordination, busbar ratings and neutral handling all called out.

DWG / 02

Panel general-arrangements

LT main panels, distribution boards and control panels: front view, internal layout, busbar arrangement, cable entry, IP rating.

DWG / 03

Power & cable distribution

Cable schedules, tray and conduit routes, glanding details, panel-to-panel interconnection, lift / pump / HVAC feed paths.

DWG / 04

Earthing & lightning protection

Earth-pit count and placement (IS 3043), GI strip routing, equipotential bonding, lightning conductors and down-conductors.

DWG / 05

Lighting design & illumination

Lux calculations, fixture schedules, circuiting and switching plans, coordinated with the architectural intent for the space.

DWG / 06

ELV layout drawings

CCTV camera placement and cable runs, access-control loops, fire-alarm device layout (smoke, heat, MCP, sounders), structured cabling.

DWG / 07

Substation & transformer foundation

Civil foundation layouts for outdoor and indoor substations, oil-pit, soak-pit, rail gauges, MSEDCL submission drawings.

DWG / 08

As-built drawings

Close-out package handed over to the owner: what was actually installed, with red-lines reconciled.

MEP coordination

The other agencies on site, and what we coordinate with each.

A project moves forward when every agency on site can read each other's drawings cleanly. Shreetuvis handles these coordination interfaces as standard practice.

AGENCY / 01Mechanical & HVAC
Chiller-plant motor loads, AHU and FCU power feeds, VFD coordination, condenser-water pump motors, interlocks for fire-mode operation.
AGENCY / 02Plumbing
Pump motor loads (lift booster, fire pump, sewage), water-heater feeds, lift-pit drainage interlocks, sensor-tap power supplies.
AGENCY / 03Fire & life safety
Fire-alarm panel, sprinkler-pump start/stop interlocks, supervised circuits, smoke-extraction fan power, emergency-light circuits, MCP locations coordinated with egress.
AGENCY / 04Networking & security
Server-room load, structured-cabling rack power, UPS sizing for IT, CCTV / access control / intercom circuits integrated into the ELV scope.
AGENCY / 05Structural
Slab thickness and load-bearing for panel rooms, embedded conduit coordination with rebar layout, transformer foundation rebar.
AGENCY / 06Architectural
Switch and socket positions coordinated to room intent, fixture types and finishes, panel-room locations, surface vs. recessed DB choices.
Sample · drawing register

How we document a project.

Every project carries a drawing register: the index that tracks every drawing produced, its revision, its approval status and the workflow from concept through GFC (Good-for-Construction) and AFC (Approved-for-Construction) to as-built. The drawings themselves are project-confidential, so what is shown below is the register format.

PROJECT
Sample · Reference
CLIENT
Confidential
PROJECT NO.
STPL-26-REF
REGISTER REV
R03 · 2026-05
Drawing No. Title Rev Date Status
STPL-26-REF-SLD-001LV Single Line DiagramR22026-04-18AFC
STPL-26-REF-SLD-002DG – Mains Changeover SLDR12026-04-12GFC
STPL-26-REF-PNL-001Main Distribution Panel · GAR32026-05-02AFC
STPL-26-REF-PNL-002APFC Panel · GAR12026-04-20GFC
STPL-26-REF-PNL-003Distribution Board DB-A · GAR02026-03-30Draft
STPL-26-REF-LAY-001Electrical Layout · Ground FloorR22026-05-10AFC
STPL-26-REF-LAY-002Electrical Layout · First FloorR12026-05-08GFC
STPL-26-REF-CAB-001Cable Schedule · HT & LTR12026-04-22GFC
STPL-26-REF-EARTH-001Earthing Layout · PlotR22026-04-15AFC
STPL-26-REF-LIGHT-001Lighting Layout & Lux CalculationR12026-04-26GFC
STPL-26-REF-FAS-001Fire Alarm Layout · Floors 1 – 3R02026-03-28Draft
STPL-26-REF-CCTV-001CCTV Camera LayoutR12026-05-05GFC
STPL-26-REF-LOAD-001Load Schedule & Diversity CalculationR22026-05-12AFC
STPL-26-REF-MSEDCL-001Transformer Drawing · MSEDCL ApprovalR12026-04-08AFC
STPL-26-REF-AB-001As-Built Drawing Set · Complete Package——Pending

Sample format · drawing numbers and project metadata above are illustrative · real registers are project-specific and held internally

Tools & standards

What's in the drawing register, by reference.

Every drawing is produced against a named standard. Below are the tools we draw in, the codes we draw against, and the workflow that takes a drawing from concept to as-built.

CAD
AutoCAD, with revision tracking on every drawing produced and archived
Workflow
Concept → GFC (Good-for-Construction) → AFC (Approved-for-Construction) → as-built
Earthing
IS 3043 (Code of Practice for Earthing)
Panels
IS 8623 (factory-built assemblies of switchgear)
Fire alarm
NFPA 72 / NBC compliance
Wiring
NEC, IS 732 (Code of Practice for Electrical Wiring Installations)
MSEDCL
Approved-drawing submission & sanctioned-load documentation
Handover
As-built drawing set + drawing register + revision log to owner
Get in touch

Send us your project's BoQ or schematic.

We'll come back with a priced scope and our drawings.