Multifunction meters per panel, per floor or per cost centre, communicated over RS485 / Modbus to a web dashboard so plant operators and facility managers can see where the kWh actually go. It pays back through tariff optimisation, load discipline and early fault detection.
Every EMS deployment we do follows the same five layers. The choice within each layer adapts to budget and scope.
Schneider · Rishabh · Elmeasure · L&T · Siemens. kWh, kVA, kVAR, power factor, voltage / current per phase, harmonics, demand. Class 0.5 / 1.0 accuracy with CT inputs sized to the bus.
Current transformers (CT) and potential transformers (PT) sized to the load, mounted in the panel. Typical CT specification: 15 VA burden, 0.5 class accuracy, separate CTs for power-factor sensing per phase.
RS485 / Modbus RTU daisy-chain between meters, with a Modbus-TCP gateway to the building's network. Optional 4 to 20 mA and pulse outputs for legacy SCADA integration where the customer already has one.
Local data logger collecting meter readings on configurable intervals (typically 1 / 5 / 15 min). Forward to a local server (for air-gapped sites) or cloud (for multi-site facility management).
Web dashboard with kWh trends by section, demand-profile graphs, power-factor and harmonics, tariff cost roll-up, and email or SMS alarms for over-demand, low PF and voltage out of range. Reports for monthly facility review.
A stylised representation of a Shreetuvis EMS dashboard, the kind a plant operator or facility manager keeps open on a second monitor. Real deployments are tailored per site; this view shows the standard set of widgets we ship with most installations.
Stylised preview · real deployments are tailored per site and reflect the customer's panel layout, sections and tariff structure.
The dashboard is live. Explore an open demo of the real Shreetuvis EMS, or ask us to set up a demo configured for your own panels and load profile.
Section-level metering shows a facility where its money actually goes. The returns fall into the categories below.
Not every project needs EMS. It earns its place at an installed load above roughly 250 kVA, in a multi-tenant or multi-department building where cost allocation matters, or at a critical-load site (hospital, data centre, pharma) where uptime visibility is the value. Below that, a monthly bill review may be enough.
We're happy to size and quote EMS as part of a turnkey electrical scope, or as a retrofit to an existing panel. Most multifunction meters can be retrofitted without panel modification, given suitable CT and PT space.
The promoter is a Certified Energy Auditor. Bureau of Energy Efficiency, Government of India. EMS deployments are sized and read with an auditor's eye: what the energy story actually is, where the wasted kWh sit, and which intervention is realistic.
Tell us the panel layout and the load profile. We'll come back with a meter-by-meter scope, the communication architecture and a payback estimate.